ABOUT THE PROJECT
Auckland Council : $1.3 million
This contract consisted of laying a new concrete stormwater pipeline, ranging from 225mm to 825mm diameter, on Porchester and Arimu Roads. The total length of pipeline laid was approximately 900 metres, through public areas and private properties. The terrain was difficult due to the 'peaty' nature of the land.