ABOUT THE PROJECT
NZ Strong : $3.6 million
Installed 400m of deep Sewer and Stormwater and Cut to Fill of approximately 8500m3. We removed approximately 10,000m3 of material off site.
Excavated footing and foundations and floor preparation for all buildings.
Drainage , subsoil drains and 12 raingardens.
Roading , kerbs and V channel and hotmix.
Retaining walls.
Concrete footpaths standard grey to 8kg black oxide with exposed finish.