ABOUT THE PROJECT
Karaka Village Development: $ 24 million
Karaka Village is a master planned community of 81 hectares in countryside of Karaka, bringing together an urban design with a rural setting.
The first stage comprises of all roading and utilities for 212 lots, including an upgrade to the intersection of Linwood and Dyke Road. McKenzie & Parma collaborating with Karaka Village Ltd and liaising with various stakeholders.
The scope of works included:
- Installation of 5km concrete stormwater pipe, with diameters ranging from 225mm to 1350mm, including rip-rap outlet structures and check dams.
- Formation of 3.1km new asphalt roads including signage and line marking
- Formation of 5.1km of Concrete Footpaths including Pram Crossings and 4 x JOAL’s.
- Installation of 100 Streetlights Construction of new roundabout at the intersection of Linwood Road and Dyke Road, including Traffic Management.
- Installation of 1km Block Retaining Walls
- Installation of 3500m2 drainage blanket to receive future treated wastewater from the newly built Treatment Plant.