ABOUT THE PROJECT
Goodman Nominees Limited : $3.5 million
This contract consisted of bulk earthworks, stormwater and sanitary sewer drainage (up to 825mm diameter), 1,000 large diameter eight metre piles, and extensive siteworks and pavement construction.
As the site was contaminated with asbestos, elaborate monitoring and practical measures had to be effected throughout the contract period.